Better Cash Flow with SHME Framing System

In spec home building, cash flow is one of the most critical components. SpecHomesMadeEasy will help you IMPROVE YOUR CASH FLOW by:

Cash-car to the rescue!

Quick! We need cash delivered now!!

1) Ensuring YOU get 100% funds disbursement on your framing draws in the quickest timeframe possible.

2) Putting CASH into your wallet with a SHME Certified Dealership Factory Rebate.

3) Eliminating additional framing materials costs due to jobsite theft.

In order for you to receive money from your bank for the framing construction draw, a lien-able structure must exist on the property. In a conventional stick-framing/lumber-drop approach this can take months and leaves you without any cash flow.

With SpecHomesMadeEasy, our preferred lender will ensure a bank inspector comes to your jobsite within 10 days of the last SpecHomesMadeEasy delivery. The bank inspector must see that all framing materials have become part of the house in order for you to receive 100% fund disbursement for your framing construction draw.

Without sufficient amount of cash, construction will come to a screeching halt

This is a very typical stick-framing/lumber-drop jobsite.

Can you tell which materials are still usable versus to which ones aren't?

If a bank inspector came to this jobsite within 10 days of the final materials delivery, the chances of you getting even 50% of your framing draw request would be slim to none.

In a conventional stick-framing/lumber-drop approach, this could take months and often results in partial draws. With SpecHomesMadeEasy, you get 100% OF YOUR FRAMING DRAW REQUEST EVERY TIME.

If you don’t get 100% of your framing draw, it can kill your homebuilding process because you:

2) PUTTING CASH INTO YOUR WALLET WITH A FACTORY REBATE

In addition to your 100% funds disbursement, SpecHomesMadeEasy PROVIDES YOU WITH A FACTORY REBATE redeemable on the framing draw once you become a SpecHomesMadeEasy Certified Dealership. The factory rebate INSTANTLY PUTS CASH IN YOUR WALLET, significantly helping your cash flow.

3) ELIMINATING ADDITIONAL FRMAING MATERIALS COSTS DUE TO JOBSITE THEFT

Jobsite theft poses an additional cash flow problem for conventional stick-framing/lumber-drop job sites. With thousands of dollars of lumber, studs and plywood left unattended on site, your jobsite becomes a prime target for theft.

Jobsite theft is all too common

It would cost $1,000's just to fence off the Lumber-Drop materials...

Because the conventional stick-framing/lumber-drop approach orders material and labor separately, YOU are responsible to buy replacement materials when theft occurs. Not only are you out the materials and the money you spent on the stolen goods, you must locate additional funds to purchase replacement materials (and hope that those don’t get stolen as well).

Because SpecHomesMadeEasy delivers pre-assembled wall, floor and roof systems, it is nearly impossible to steal materials from your site. In fact, not one SpecHomesMadeEasy customer has EVER had a wall panel stolen from a jobsite!

Spec Homes Made Easy Site Map

Copyright © 2007 Spec Homes Made Easy
Division of Sockeye Construction Corporation
Phone: 253-737-4456